Skip to content

Knowledge baseMapping & constructionChecking a ship cargo

Is the ship cargo correct? Measuring at unloading

A ship discharges bulk on the quay, and the question is always the same: is this really the quantity on the papers? By measuring just before and just after unloading, you independently record what actually arrives.

Why this matters

With a ship cargo it quickly involves large volumes and therefore large amounts. The transport papers state what was supposedly loaded at the port of departure — not what lands on your quay. Discrepancies through loss, moisture or simply a miscount are expensive, and without your own measurement you are empty-handed in a discussion.

How the measurement works

The principle is simple: two measurements, one difference.

Both flights are short and entirely from above. Why those volumes are reliable, read How accurate is a volume measurement?

Independent evidence

The strength lies in the independence. You measure, not the supplier and not the carrier. The data is dated, controlled and reviewable. If a dispute arises over the discharged quantity, you put a measurement on the table instead of a suspicion.

Common mistakes

Why with a drone (and why Droneview)?

A drone measures a whole quay or bunker in one go, safely and without really interrupting the unloading. Droneview operates EASA-certified and RTK-controlled, and delivers a verifiable report. How we track stock and volumes structurally, you can read on stockpile volume measurement & inventory.

Frequently asked questions

How do you check a discharged ship cargo?

By measuring the stock on the quay or in the bunker just before and just after unloading. The difference is the quantity actually discharged, recorded independently with date and coordinates.

Why a drone instead of the ship's papers?

The papers state what was supposedly loaded; a measurement on the quay states what actually arrives. In case of a discrepancy you have independent proof rather than only one party's word.

Does the measurement disrupt unloading?

No. The flight is from above and short; unloading does not have to stop, apart from the two brief measurement moments.

Have a cargo checked independently?

Tell us when the ship unloads — we plan the measurement before and after discharge.

Request a quote